Product Details :Back

(Vishay BCcomponents) - NTC Thermistors, Epoxy PVC Long Leads Sensors

13 February 2023

These sensors exist of a small NTC chip reflow soldered between two AWG #24 UL-2468 style wires.

(Vishay BCcomponents) - NTC Thermistors, Epoxy PVC Long Leads Sensors

2468 style wires. They are lacquered and insulated with black epoxy.
FEATURES
Accurate over wide temperature range
High stability
Excellent price / performance ratio
High adhesive strength between PVC wire and the encapsulating lacquer
Material categorization:
APPLICATIONS
Available Temperature measurement, sensing and control in remote locations and for various environmental conditions.
DESIGN-IN SUPPORT
Other wire length and wire type (UL-2651 style PVC 105 °C), other wire gauge, are available on request.The products can be provided with a connector on request. A UL-2651 105 C multistranded version is available as NTCLE430..
View Products

Looking for help? Visit our FAQ's Section to answer to all your questions

 

X-ON Worldwide Electronics

Welcome To X-ON Electronics
For over three decades, we have been advocating and shaping the electronic components industry. Our management complements our worldwide business scope and focus. We are committed to innovation, backed by a strong business foundation. If you need a trustworthy supplier of electronic components for your business – look no further.
 

Copyright ©2026  X-ON Electronics Services. All rights reserved.
Please ensure you have read and understood our Terms & Conditions before purchasing. All prices exclude GST.

Image for all the cards that are accepted Image for all the cards that are accepted Image for all the cards that are accepted Image for all the cards that are accepted Image for all the cards that are accepted AS9120 Certified