USER GUIDE TB-9105 724 Plus Monitor Verification Tester Operation Instructions Made in the United States of America Features and Components A B C D Figure 1. SCS 770734 724 Plus Monitor Verification Tester E F Description G H The SCS 770734 724 Plus Monitor Verification Tester is used to perform periodic test limit verification of the SCS 770724 724 Plus Workstation Monitor. Verification may be accomplished without removing the monitor from its workstation. The Verification Tester is National Institute of Standards and Technology (NIST) traceable. Frequency of verification is based on the critical nature of the ESD susceptible items handled. SCS recommends annual calibration of workstation monitors Figure 2. 724 Plus Monitor Verification Tester features and the 724 Plus Monitor Verification Tester. The SCS and components 724 Plus Monitor Verification Tester meets ANSI/ESD S20.20 and Compliance Verification ESD TR53. A. Ground Lead: Connect to equipment ground to provide a ground reference for the 724 Plus Monitor Verification Tester. Packaging A. Mat Test Lead: Connect to the monitor s mat 1 724 Plus Monitor Verification Tester terminal to verify its mat test circuit. 1 Alligator Clip 1 10mm Stacking Snap C. Operator Test Lead: Insert into the monitor s 1 Ground Plug Adapter operator jack to verify its operator test circuit. 1 Ground Extension Cord, 5 1 9V Alkaline Battery 1 Certificate of Calibration SCS - 926 JR Industrial Drive, Sanford, NC 27332 East: (919) 718-0000 West: (909) 627-9634 Website: StaticControl.com 2020 DESCO INDUSTRIES INC TB-9105 Page 1 of 4 December 2020 Employee OwnedD. Rotary Switch: Selects the various pass and fail load values needed to verify the monitor s operator test circuit. E. Body Voltage Pushbutton: Loads the selected body voltage stimulus onto the Operator Test Lead when pressed. F. Body Voltage LED: Illuminates blue when the Body Voltage Pushbutton is pressed and voltage stimulus is applied onto the Operator Test Lead. G. Mat Fail Pushbutton: Simulates a MAT FAIL condition on the 724 Plus Workstation Monitor when pressed. H. Low Battery LED: Illuminates yellow when the battery power for the body voltage test circuit is low and needs to be replaced. Operation Verifying the Operator Resistance Circuit 1. Connect the 724 Plus Monitor Verification Tester s green ground lead to equipment ground. This may be done using the included Ground Plug Adapter or alligator clip. Figure 4. Connecting the 724 Plus Monitor Verification Tester to the 724 Plus Workstation Monitor s operator 1 jack Verifying the Operator Body Voltage Circuit 7. Set the rotary switch to +2.5V FAIL, and press the Body Voltage Pushbutton. The monitor s operator 1 LED should blink red, and its audible alarm should sound. Figure 3. Using the Ground Plug Adapter to ground the 724 Plus Monitor Verification Tester 8. Set the rotary switch to +2.5V PASS, and press the Body Voltage Pushbutton. The monitor s operator 1 2. Insert the verification tester s black operator test LED should illuminate green, and its audible alarm lead into the 724 Plus Workstation Monitor s should not sound. operator 1 jack. 9. Set the rotary switch to -2.5V PASS, and press the 3. Set the rotary switch to 1.5M LOW. The monitor s Body Voltage Pushbutton. The monitor s operator 1 operator 1 LED should blink yellow, and its audible LED should illuminate green, and its audible alarm alarm should sound. should not sound. 4. Set the rotary switch to 1.5M PASS. The monitor s 10. Set the rotary switch to -2.5V FAIL, and press the operator 1 LED should illuminate green, and its Body Voltage Pushbutton. The monitor s operator 1 audible alarm should not sound. LED should blink red, and its audible alarm should sound. 5. Set the rotary switch to either 10M PASS or 35M PASS, whichever one is appropriate. The monitor s 11. Disconnect the operator test lead from the monitor s operator 1 LED should illuminate green, and its operator jack. audible alarm should not sound. 12. Connect the operator test lead to the monitor s 6. Set the rotary switch to either 10M HIGH or 35M operator 2 jack. Repeat steps 1-11 to verify the HIGH, whichever one is appropriate. The monitor s monitor s operator 2 resistance and body voltage operator 1 LED should illuminate red, and its circuitry. audible alarm should sound. SCS - 926 JR Industrial Drive, Sanford, NC 27332 East: (919) 718-0000 West: (909) 627-9634 Website: StaticControl.com 2020 DESCO INDUSTRIES INC TB-9105 Page 2 of 4 Employee Owned